LADY DIDA
After 3 visits to Athens, Lady Dida came to Bodrum for maintenance in October 2018. At the end of the 248-day refit and repair process, the entire hull and superstructure of the yacht were repainted. The saloon in the upper deck has been changed to a cabin.
The floors of all cabins have been renewed. The crew cabin in the aft was dismantled and the hull steel in this section were renewed. The cabin has been completely rebuilt.
All auxiliary pumps in the engine room were dismantled and maintained. Plates of constructional tanks have been changed. 8 tons of steel was changed below waterline. After cruising for 1 season, the yacht returned to Bodrum for other works in 2019. In 2020, the yacht's propulsion systems were renewed.
The funnel and navigation mast and other parts that were not painted before were painted. Upgrades were made to the guest cabins. The yacht was delivered to its owner in 2021.
Specification
BUILDER | Marinverkstaderna |
---|---|
NAME OF YACHT | Lady Dida |
BEAM | 7,00m (22.96ft) |
LOA | 34m (111.54ft) |
DRAFT | 4m (13.12ft) |
YEAR OF BUILD | 1954 |
---|---|
TYPE | Full Displacement Motor Yacht |
CONSTRUCTION | Steel |
FDC REFIT YEAR | 2016/2017 |